Common Council
The Common Council adopted a two-year moratorium on cryptocurrency mining and data centres, amended on the floor to create a nine-member task force reporting within 18 months. It forced the administration to document community meetings before painting a bike lane, held a $2 million buildings contract over “fiscal uncertainty,” and sent a $4.5 million claim onward without saying the figure aloud.
Of the 108 items the Common Council voted on Tuesday, 107 were referred, received, filed or approved inside bloc motions that took seconds each. One was actually decided, actually argued, and actually rewritten at the table: a two-year moratorium on cryptocurrency mining and data processing centres, sponsored by Joseph Golombek and adopted as amended, 9–0.[2]
The amendment is the story. Majority Leader Leah Halton-Pope read it into the record in full, and it does not pause development so much as build the body that will decide what replaces the pause. “Per conversation with my colleagues, we agreed that we would add to the moratorium a task force… Corporation Counsel, we're asking them to add it to the final ordinance amendment.”[1]
What she read in: a nine-member voting task force made up of the city's Climate Action Manager, its Principal Planner, one member of the Law Department, two members with economic development and finance experience, two with backgrounds in environmental science, engineering, infrastructure or data centre operations, and two community members with demonstrated interest in land use, environmental protection, neighbourhood affairs or infrastructure. All nine appointed by majority vote of the Council. The task force must adopt bylaws at a first meeting, meet at least monthly, and within 18 months deliver a report on the economic, fiscal, environmental, infrastructure, land-use and community effects of data centres — naming employment, tax revenue, energy use, water consumption, infrastructure capacity, noise, air quality, traffic and emergency services — together with recommended changes to the zoning code, ordinances and real property tax policy.[1]
Halton-Pope was explicit that this is not a stand-alone act: “The state already has a moratorium. The ask of myself and my colleagues is just, if we're gonna put a task force together, we're gonna do a moratorium that coincides with the state or even extends it, that we do something in between to make sure that when the moratorium is lifted, that we protect all parties involved, which includes business, the environment and of course, most importantly, the citizens that live here.”[1]
Golombek opened by correcting the record about himself — “People had called me and were assuming what my position was on data centres and some of the assumptions were utterly and completely wrong” — and then gave the concrete reason, which is a zoning accident rather than an ideology.[1]
His worry is quality of life and it is specific: “You have people that have put their lives into their houses and into their neighbourhoods, and if a data centre was to open up and there was that constant humming or noise that is associated with it, that could completely destroy the quality of life for residents that live there.” And water: “One of the things that I wanna learn more about is the issue with water, the amount of water that it uses and what happens to that water. Are we able to truly clean it? Because… we have the five Great Lakes, we have so much fresh water that is at our fingertips that we have to make sure that we protect it at all cost.”[1]
Nowakowski supplied the mechanism the task force will have to work through, drawing the parallel to the Council's short-term-rental work: the question is not whether data centres are good but where the Green Code already lets them go — and his and Golombek's districts, he said, “represent a large swath of more of the industrial lands that actually have space and abandoned parcels of the industrial past, and so this is certainly that both of our districts and the city at large has to get ahead of.”[1]
One procedural loose end worth a phone call. The President asked whether the amendment text had reached the lawyers. The answer was not clean: “Those are already been sent, or if they haven't, they will be. They may not have gone to you, Miss Assistant Corporation Counsel, but they'll go to Corporation Counsel as a whole if they have not.” On the Majority Leader's own account, the Council adopted an ordinance amendment whose text may not yet have been transmitted to the Law Department when the vote was taken.[1]
The largest number on Tuesday's agenda was never spoken out loud. Item 47 is “Margarita Rossy, as Administrator of the Estate of Jose Hernandez-Rossy, $4,500,000.00.” Its entire treatment on the recording is one sentence from the chair: “Item number 47, Margarita Rossi. Motion to send items 47 through and including 61 to the Claims Committee.” Seconded, 9–0, no comment from any member, and no figure read into the room.[1][2]
It did not travel alone. The same bloc carried $5,955,000 in the five largest claims: item 50, Sara Plenty-Paige at $900,000 together with Zoraida Rivera at $210,000; item 48, Monica Taylor at $175,000; item 49, Pablo Alicea at $125,000. And the referral had a very short road to travel — at the close of the meeting the President announced that the Committee on Claims would sit the following day, Wednesday, September 30, at 1 p.m.[1][2]
What this brief does not know, and will not guess at. Neither the agenda packet nor the recording says anything about what any of these claims is about — no department, no incident, no date, no description. A claim against a city can arise from almost anything. This publication is not in a position to characterise the underlying matters from the documents in front of it, and does not do so here; the claim files and the Law Department are where that is answered. What is reportable is the shape of the thing: nearly six million dollars of proposed settlements moved through a legislative body in a single motion, without a figure being said aloud, to a committee meeting less than 24 hours later.[3]
The sharpest exchange of the evening was not about a bike lane. It was about being told.
A routine motion to approve the hire of CPL for Phase 2 of the Bicycle Facility Master Plan Implementation had already been made and seconded when President Pro Tem Zeneta Everhart interrupted the sequence. “We've been talking about this item for weeks now, but actually it's for about two years since I got here… I am fine with approving it, but… this is an approval with conditions.”[1]
Her objection was to a pattern: “The administration as well as the different departments within City Hall over this last year have done projects across the city in our respective districts without any conversation with council members, and we cannot continue to operate that way. If we want to put bike lanes down in communities, in neighbourhoods, I'm cool with it, but you gotta go talk to the people who live there, because I don't live on every block of the city of Buffalo.” And the consequence: “We get surprised. We drive down streets, and then we're calling departments because where did these changes come from? That is not how government should operate.”[1]
She drew a distinction that will matter when the meetings happen: “I do not want to see any work being done until the residents who live in that neighbourhood are contacted, until a community meeting is held with the people who live there — not the people who have an interest in bike lanes, but the people who actually live there.”[1]
Halton-Pope went further. “I think at this point, we shouldn't have to keep saying these things to the people that work in the city of Buffalo. I really don't. This is representative government, which means you need to talk to the people… And that's the only way I know how to operate.” Then she turned it into an enforceable condition, rescinding the original motion and replacing it with approval conditioned on a community meeting held first and documented with the names, addresses and telephone numbers of everyone who participated, that documentation shared with each affected Council member and published on the city and Council websites.[1]
It carried 9–0 as Approved with Conditions — the only item on the docket with that disposition. A reader can hold the administration to it: there is now a specific, checkable paper trail owed before any paint goes down. Two things the record does not supply, and both are worth asking for: the contract carries no dollar figure anywhere in the packet or on the tape, and the rescinded first motion exists only on the recording.[2]
Finance chair Mitchell Nowakowski declined to pass a $2,000,000 permission-to-hire for city-wide architectural and engineering master planning services, and explained himself at unusual length for a body that mostly votes in blocs. “When it comes to expenditures, of course this council needs to scrutinise expenditures, especially in these times where we have fiscal uncertainty.”[1]
He was careful to say the request has merit: the city owns community centres, municipal buildings, fire stations and police precincts, and “we need to know if they're up to code, if they're up to ADA standards, what the exact issues are… so that if we are to allocate resources for those buildings, we have engineers that are able to identify those issues and then that we can plan ahead.” Then he named a building and priced the worst case out loud: “For my district, what's city owned is the Lincoln Center, and I know that there's a ton of problems there, but I need someone to go in there to help diagnose those problems and then see what it would cost in the future. If it's to knock it down or to fix the roof, there's HVAC issues, window issues.”[1]
He moved to recommit; Christopher Scanlon seconded; 9–0. A Finance chair publicly entertaining demolition of a city-owned community centre, while citing fiscal uncertainty as the reason to slow the very contract that would tell him whether demolition is necessary, is the kind of circularity worth following into committee.
Three change orders were genuinely approved on Tuesday, totalling $945,000, all inside a single bloc motion and none of them read aloud: $540,000 for Change Order #2 on the Residuals Handling Improvements Project (State Group Industrial); $305,000 for Change Order #1 on traffic engineering services, Group 1036 (C&S Companies); and $100,000 for Change Order #2 on Mass Avenue Electrical Upgrades Phase 1 (O'Connell Electric). The smallest item of the night was in the same bloc — a change order of $284.78 for bike-room improvements at the History Museum.[2]
Everything else large only moved: $3,569,987 in agreements with GoBike Buffalo (corrected and referred to Finance), $645,504 in bids for girder repair and replacement at the Augspurger parking ramp, and the $2 million master-planning contract held above.[2]
Two awards deserve a question. The Parking Department's sole-source contract with BER-National (Parkeon) for meter and reporting software was approved with no dollar value stated anywhere — and the recording carries no audible second for it, though the record logs one. And item 18, a contract for property board-up and securing services, was withdrawn; the record logs a 9–0 vote to withdraw, while the tape contains only the chair saying “Item number 18 has been withdrawn.” Moments later the Majority Leader was recognised to ask a question about the remaining board-up contracts, then declined to ask it.[1][2]
Nobody from the public spoke at this meeting. There was no public-comment period on the recording. Two residents nonetheless reached the Council in writing, and each was disposed of in seconds.
Item 80 is a resident's complaint about trees at Ralph Wilson Foundation Park, filed with before-and-after photographs and a supporting letter from a landscape professional. Spoken treatment, in full: “Item number 80, concerns trees of Ralph Wilson Foundation Park.” Referred to Community Development, 9–0, in about eight seconds. Item 78, a resident's concerns about the city's Transition and Transformation Fund, filed with exhibits, got one sentence and the same destination.[2]
A third filing sets a date readers may want: a special use permit application for a tavern with outdoor dining at 568 South Park Avenue in an N-2C zone, with a public hearing scheduled for November 4.[2]
All nine members — Bollman, Everhart, Feroleto, Golombek, Halton-Pope, Nowakowski, Rivera, Scanlon and Wyatt — were present and voted on every item. All 108 recorded votes were 9–0; nobody voted no, abstained or recused all evening. Majority Leader Halton-Pope moved 90 of the 108. This table follows the city's own recorded-vote file and selects the items that were decided, disputed or unusual; the rest were referrals and filings taken in blocs.
Sponsored by Golombek. Moved by Halton-Pope, seconded by Golombek as sponsor. The floor amendment establishes a nine-member voting task force appointed by Council majority — Climate Action Manager, Principal Planner, one Law Department member, two with economic development and finance experience, two with environmental science, engineering, infrastructure or data centre operations experience, and two community members — which must adopt bylaws, meet monthly, and report within 18 months on economic, fiscal, environmental, infrastructure, land-use and community impacts, with recommended changes to the zoning code, ordinances and real property tax policy.
The only item of the evening adopted as amended, and the only one that produced sustained debate. Whether the amendment text had reached Corporation Counsel before the vote is unresolved on the record.
The only item carrying this disposition. An initial straight approval was moved and seconded, then rescinded after objections from the President Pro Tem and the Majority Leader, and replaced with approval conditioned on a community meeting being held before any work, documented with the names, addresses and telephone numbers of participants, shared with affected Council members and published on the city and Council websites.
The record preserves only the final disposition; the first motion and the rescission exist only on the recording, where the chair identifies Rivera as seconding the rescission and Everhart the approval as amended. No contract value appears anywhere in the packet or the audio.
Moved by Finance chair Nowakowski and seconded by Scanlon, with reasons stated on the record: fiscal uncertainty, the need to know whether city buildings meet code and ADA standards, and a specific example in the Lincoln Center, for which he said the diagnosis could run to either a new roof or demolition.
The chair said “motion to recommit” on the tape; the city's record logs the disposition as a referral to Finance. The two are not the same act — a recommittal sends an item back to a committee that has already had it — and the official minutes should be checked.
Item 47, the $4.5 million claim, heads a bloc that also carries item 50 ($900,000 and $210,000), item 48 ($175,000) and item 49 ($125,000) — $5,955,000 across the five largest. No figure was spoken aloud and no member commented. The Claims Committee sat the following afternoon, Wednesday September 30 at 1 p.m.
Neither the agenda packet nor the recording states what any of these claims concerns. This brief reports the referral and the amounts as filed and makes no characterisation of the underlying matters.
Item 13, $540,000, Residuals Handling Improvements, State Group Industrial. Item 12, $305,000, traffic engineering services Group 1036, C&S Companies. Item 15, $100,000, Mass Avenue Electrical Upgrades Phase 1, O'Connell Electric. Also in the bloc: $54,050 for 271 Grant Street Year 49 improvements, $29,100 for BFD mechanical/electrical/plumbing upgrades, and $284.78 for History Museum bike room improvements.
The record logs a 9–0 recorded vote to withdraw, moved by Halton-Pope and seconded by Nowakowski. The recording contains no motion, no second and no vote — only the chair saying “Item number 18 has been withdrawn.” No reason was given.
Shortly afterwards the chair recognised the Majority Leader for a question concerning the remaining board-up contracts; she declined to ask it. Nothing of that exchange appears in the record.
Approved inside a three-item motion with no dollar value stated in the packet or aloud. The recording carries the motion but no audible second; the record logs Bollman as seconding all three. A sole-source award is an award made without competitive bidding, so the absence of a stated value is worth a records request.
Item 80 carries four attachments including before-and-after photographs of planting at Ralph Wilson Foundation Park and a landscape letter from a third party. Item 78 carries a filing with exhibits on the city's Transition and Transformation Fund. Both referred to Community Development with one sentence each and no discussion.
The resident's surname in item 80 is spelled one way in the item title and another in all four of its own attachment filenames; this brief does not print either spelling.
Why this brief is three weeks late, and it is our fault. This publication's Buffalo ingest reads the city's CivicClerk records portal. That portal caps a query at fifteen results and hands back a link to the next page; our poller was not following that link, and because it sorted oldest-first it had been reading the same fifteen September meetings twice a day since late September while every newer meeting piled up unseen. It logged a healthy-looking result each time. The fault was found and fixed on October 17, and eleven Buffalo meetings — this one among them — were ingested at once. Nothing was missing from the city's side; the city published on time.
Capture. 35.2 minutes, faster-whisper “medium,” 586 segments of which 524 are distinct, language confidence p=0.997, content to 2,081 of 2,113 recorded seconds. The video is the city's own, published to its portal after the meeting and converted to audio here. The recording carries roughly eight minutes of room noise before the gavel, which is not reported. Timestamps cited in this brief are elapsed audio, not times of day.
How the vote table was built. For Buffalo this publication takes the All Motions table from the city's own recorded-vote file — which names the mover, the seconder and every member's yes, no or abstention for each item — and cross-checks it against the recording, citing the item number. Where the two disagree, the disagreement is reported rather than resolved.
Where they disagree here. Three items name a different seconder on the tape than in the record: item 21, item 33 and Legislation submission 11. The chair announces a bloc of “items 16 through 22” to Finance, but the record sends only 16 through 20 there and disposes of 21 and 22 separately. Item 80's seconder is blank in the record and supplied by the tape. Item 77 carries a duplicated vote line for a single licence notice. Six items the chair calls a “motion to recommit” are logged as first referrals. Item 18 has a recorded 9–0 vote that does not exist on the tape, and items 72 to 74 have a recorded seconder who is not audible. None of these changes an outcome; all of them should be checked against the clerk's minutes.
Names. The transcription model is “medium,” which is adequate for sense and unreliable for proper nouns — it renders Bollman variously as Coleman and Bowman, Golombek as Galumbic and Glombeck, Halton-Pope as Hawtempo and Hilton-Pope, Feroleto as Farrelletto. All member names here follow the city's recorded-vote file. Where a name was audible only on the tape and appears in no document — the clergy member who gave the invocation, the people thanked by name during the data centre debate, the residents remembered in the in-memoriam remarks, and a Lovejoy block club named for its streets — this brief either omits the name or does not print a spelling it cannot stand behind. Two community organisations were named in the debate; only one, PUSH Buffalo, was rendered clearly enough to report.
Street validation was run against this publication's Buffalo street index. “Seneca Street” matched exactly; all other addresses in this brief are taken from the city's written record rather than the audio.